Existing paper production hall extension on two levels with new additional supporting facility. New winder and packaging technological line installation, designed and supplied by Raumaster (Finland). Application of prefabricated structural – and facade system.
General design: | TÉT'91 Kft. |
Structural engineer and coordination: | Tóth Tibor |
Architect: | Tóth Csaba |
Technology: | Raumaster |
Main contractor: | Swietelsky |