Meiser-Ferroste 2 new production hall

Kulcs | 2016
FullSizeRender_jav_tel

The site situated in Kulcs, nearly 15 km from main production center hall of Meiser-Ferroste in Dunaújváros. The main profile here is the production and assemlbly of aluminium structures. Our Client plans to develop the site in two phases with new industrial halls. As the first phase we prepared the plans of a 1360 sqm new produstion hall. Main features: 25 m span, steel structure, Kingspan sandwich panel covering. Construction was completed in 2016.

General contractor:TÉT'91 Kft.
Lead Architect:Tóth Csaba - 4n Architects
Lead Structural Engineer:Tóth Tibor
Mechanical:Molnár Attila
Electrical:Kiss Vilmos
Fire protection:Pfeffer József
Environmental:Deimel János
Gross floor area:1.360 sqm