Dunafin paper-mill New stock preparation and bale storage building

Dunafin paper-mill New stock preparation and bale storage building

Dunaújváros | 2014-2015
160324_duf_2

Extension of the existing Dunaújváros Paper Mill with a new stock preparation  and bale storage building.  The new building will house a raw material warehouse and a process room. In the process area, a separate block with a control room, a wet room and an electrical switch room was required. The building is connected to a transformer house. The planned new building and the existing production hall are connected by a pipe bridge for the transfer of process pipes. The integration of the new building into the internal road network and its connection to the existing utility network had to be ensured. The supporting structure of the new building is a precast reinforced concrete structure made of ferroconcrete. The interior is unsupported and the roof beams have a span of 42 m.

General contractor:TÉT'91 Kft.
Coordinating Engineer:Tóth Tibor
Lead Architect:Tóth Csaba
Structural Engineer:Tóth Tibor
Mechanical:Kürtösi Ernő
Electrical:Kiss Vilmos
Prefab structures:Regős Péter
Fire protection:Pfeffer József
Environmental:Deimel János
Technology:BHM Ingenieure (Austria)
Main contractor:Fejérduna
Gross floor area:2.400 sqm